Jump to content

Walk up ponds on long lead


Recommended Posts

Wish we had that a ten min walk from ours..but saying that mine would be in the pond every time we would walk past on a long line...LOL

  • Like 2
  • Haha 1
Link to post
Share on other sites

Robke she did try and go as close to the pond as possible when she saw the ducks but she not fussed on cold water 😂. 

Thanks all and  yes Jo we have lovely walks around us We also have an old quarry the other side of our house which she loves going over to run and climb the rocks.xx 

Link to post
Share on other sites
10 minutes ago, Shelley15 said:

Robke she did try and go as close to the pond as possible when she saw the ducks but she not fussed on cold water 😂. 

Thanks all and  yes Jo we have lovely walks around us We also have an old quarry the other side of our house which she loves going over to run and climb the rocks.xx 

Ducks in the water would mean...Bindi taking a running jump after them..and as a result me either wet or almost wet...:D

  • Like 1
  • Haha 2
Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Privacy Policy.